Home > SHOWERS >

DAT3535S-SYS-LED - MASS CASUALTY DECON SHOWER SYSTEM PACKAGE - 2 LINE, 3 OR 4 STAGE


DAT3535S-SYS-LED - MASS CASUALTY DECON SHOWER SYSTEM PACKAGE - 2 LINE, 3 OR 4 STAGE
 
Alternative Views:




Product Code: FSI-DAT3535S-SYS-LED
Call for Pricing

Description Technical Specs Extended Information
 
2 Line, 3 or 4 stage Decon Shower System for Hospitals / First Responders / Other. Includes 1 DAT3535S shower, 1 FSI Heat 200A water heater, 1 FSI HEAT 201 detergent injector, 1 F-HSP hand sprayer, 2 F-GH hoses, 1 F-GH503510 hose system, 1 F-RS conveyor, 1 F-MX1 spine board, 2 F-SFLL-1M Foldable LED Lighting, 2 F-SFLLPS-12V LED lighting power supply, 1 F-WSP33AA waste pump, 9 F-TDMSPC elevation grids, 1 F-MMU156 1.5" NST X 6 3/4" GHT outlet multi manifold, 1 F-HD300BT bladder tank, 1 F-GS3 tarp, 2 F-EM-259A. Multiple Options available. FSI reserves right to substitute products as needed that equal / exceed specifications.

Shower / Shelter Setup HD
Shower / Shelter Teardown Instructions HD
DAT Training Video
Features
  • Heavy Duty Air Berms – FSI utilizes extremely heavy duty air berm construction in all DAT® series mass casualty portable hazmat decon shower systems. FSI uses the same 1100Dtex, quadruple overlapped and glued berms found in our wide range of transom rescue boats – known for the extreme conditions they are subjected to.
  • Extremely Rapid Deployment – FSI Portable Shower Systems are compact, fully integrated, and supplied complete in a heavy duty carry sleeve/bag. FSI Shower systems inflate virtually unaided – with the use of compressed air, or via a supplied electric inflator/deflator with a hands-free connector within minutes (size of unit and method of inflation dependent). The inflatable decontamination shower units are meant to be deployed simply and quickly – with modest training and few personnel.
  • Heavy Duty Construction – No matter which model or size, FSI shower systems offer incredible stability even in high wind conditions up to 70 mph (115 kph) and more when properly tied down/staked off.
  • ANSI #113 COMPLIANT - IDEAL FOR GROSS DECON PER NFPA1851